Fuqing Nuclear Power Plant Construction
Type : Crawler Crane
Date of Release : 2012-11-15

Sany crawler crane hoisted the key component for the first time On August 18th,2010 at Fuqing nuclear power plant.

SCC10000 succeeded to hoist the dome for the first time in China which is the key component of the nuclear power.It's the first time that the crawler crane were applied in nuclear power plant constructions.

SCC10000 adopted LJDB duty with 60m boom,54m jib and 24m superlift radius to hoist the doom of No 1 generating set which is weight 170t, 11m high and has 37m diameter,it put the doom on the thimble up to 60m high.On September 28th,2010, at Qinshan nuclear power plant.

SCC10000 adopted LJDB duty with 60m boom,54m jib and 55.2m superlif t radius to hoist the doom of No 1 generating set which is weighting 170t, 11m high and has 37m diameter,it put the doom on the thimble up to 72m high.