Thermal Power Plant Construction in Brazil
Type : Crawler Crane
Date of Release : 2012-11-15

Equipment No.:09CC25130018
Project name:Thermal Power Construction in North of Brazil
Location:Fortaleza Brazil

Users: Makro company

This equipment is the second SCC2500C purchased by Makro company, the third largest hoisting company Makro company of Brisal purchased the first SCC2500C of SANY for the wind power project. After using, they found the performance of the crawler crane is of first class quality, therefore they purchased this equipment for thermal power generation construction.

Project Backgroud
This thermal power station project was undertaken by the Italian Maire Tecnimont Project Company,the project period was three years, the investment amount was USD1.3billion. After the power plant is put into production in 2010, it would generate power of 720MW at the first stage, and USD733 million would be invested on the second stage, the power output would be increased by 360MW.

Construction Description
After the equipment arrived at the thermal power plant,SANY arranged professional engineer to assist Makro company to install and commission. The engineer commissioned 61.5meter boom+52meter amplitude jib on the construction site. After the commissioning was over, the engineer provided operation training and security training. On the construction site, this equipment was mainly responsible for hoisting the welded cage on the ground to the metal part in the high position for manual welding. This construction started from Apr. 2010 and is still going on.

The equipment is in good using condition in the whole construction rocess and wins the praise of the customer.