Adipala Power Plant Project
Type : Pile Drilling Machinery
Date of Release : 2012-11-13

Adipala power plant project, which is located in middle Jawa of Indonesia, has a capacity of 660 MW. The bored pile work adopts full-casing method, it will last for about half a year. The piling contractor bought 4 units Sany rotary drilling rigs at one time, including three units SR250 and one unite SR280RII. The SR280RII is the biggest piling machine in Indonesia, it can make 2.5m diameter pile with 84m depth. Sany has sent an full-time engineer to the project site for on-site support until the project is finished.

The general contractor said they were very glad to have Sany in this project, and the construction period would be surely reduced with reliable and powerful support from Sany.